Log in Contributions Create Account Talk Main Page
For more procedures click : Haryana
Haryana - Request for Disconnection of Electricity Connection


Procedure

[edit]

Apply In-Person:

  1. Approach the local office and collect the Application form
  2. You can also download it form the link: Link [Pg.3/5]
  3. Also refer to the “Documents to use” in the section of this procedure.
  4. Refer to the “Office Locations & Contacts” section in this procedure to see the respective address and contact details.
  5. Consumer has to submit an affidavit on Notary Stamp Paper of Rs. 10, stating the reason of permanent disconnection to the Area Executive Engineer, Distribution Division along with copy of the latest Bill and collect an acknowledgement.
  6. Consumer has to deposit the outstanding dues & has to deposit the required PD Fee at the office of Executive Engineer, Distribution Division, as per details mentioned in the Fees section of this procedure.
  7. Fill in the form and submit it at the respective office along with the required documents.
  8. Please make sure you have all the documents that are listed down the “Required Document” section of this page.
  9. The applicant will be contacted by respective officer /Call Centre Representative on email/mobile provided by you for verification.
  10. Once verification and payment procedure is successful and an acknowledgement is submitted, the disconnection will be effected according to consumer’s application.





Required Documents

[edit]


  • Application form
  • Photograph (File size must be less than 500KB.)
  • Copy of last bill.
  • Copy of payment receipt of last bill
  • Proof of ownership (File size must be less than 500KB.)
  • Proof of identity (File size must be less than 500KB.)






Office Locations & Contacts

[edit]


Dakshin Haryana Bijli Vitran Nigam Vidyut Sadan,
Vidyut Nagar, Hisar -125005 
Toll Free : 1800-180-4334 
E-Mail : 1912@dhbvn.org.in, Whatsapp : 8813999708
Contact link: Link



Eligibility

[edit]

Consumers already having an electricity connection can apply for this request.



Fees

[edit]

Disconnection and Reconnection of supply for any reason whatsoever (Disconnection and Reconnection to be separately treated as single job).

  • Consumer having load above 100BHP/75KW per job: Rs. 1000
  • Power consumers up to 100BHP/75KW per job: Rs. 500
  • All other categories of Consumers per job: Rs. 300



Validity

[edit]

The disconnection will be available as long as the mentioned period by the applicant.



Documents to Use

[edit]

Link [Pg.3/5]




Sample Documents

[edit]

Please attach sample completed documents that would help other people.



Processing Time

[edit]

The notice period shall be 30 days for all consumers. Upon service of the said notice, the licensee shall arrange to take reading, disconnect the supply, remove meter, cable etc., deliver final bill including all arrears up to the date of disconnection within 30 days from the date of said application. Upon payment, the Licensee shall issue receipt with FINAL BILL stamped on it, which shall be treated as No Dues Certificate.]



[edit]


Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.




Instructions

[edit]

  • A consumer may terminate the agreement after giving a notice in the specified format ( (Hindi, English)). The notice period shall be 30 days for all consumers. Upon service of the said notice, the licensee shall arrange to take reading, disconnect the supply, remove meter, cable etc., deliver final bill including all arrears up to the date of disconnection within 30 days from the date of said application. Upon payment, the Licensee shall issue receipt with FINAL BILL stamped on it, which shall be treated as No Dues Certificate.]
  • If the dues are not paid by the consumers the surcharge payable by the consumer on dues shall be levied up to the period of issue of section-5 notice, or for maximum eight months only.
  • The security amount shall be adjusted first and after adjusting the security amount the net arrear shall be calculated on which surcharge shall be payable by the consumer.



Required Information

[edit]

  • Connection No.
  • Contracted load
  • Date of receipt of application
  • General information
  • Individual name and designation
  • Address
  • Email
  • Mobile no.
  • Aadhar no.
  • Connected load on kW
  • Contract demand (KVA)




Need for the Document

[edit]


Please provide the need for the procedure. e.g. Birth Certificate - why do we need to have a birth certificate?



Information which might help

[edit]


Enter other information which might help.



Other uses of the Document/Certificate

[edit]

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.




External Links

[edit]

Place some external links which might help.



Others

[edit]

More information which might help people.




Content is available under Creative Commons Attribution unless otherwise noted.
Privacy policy About Wikiprocedure Disclaimers