Log in Contributions Create Account Talk Main Page
For more procedures click : Ethiopia
Ethiopia - Obtain a Permit for Expanding an Exisiting Industry


Procedure

[edit]

Apply In-Person:

  1. Application form for obtaining a permit for expanding an existing industry is available in the Ethiopian Ministry of Trade and Industry contact link
  2. Applicant should fill-in all the necessary details in application form provided by the ministry.
  3. Applicant should make sure to carry all the documents that are mentioned under the “Required Documents” section of this page (Both photocopies and originals).
  4. Fee must be paid as per the authority’s request.
  5. Applicant must attach photocopies of documents (whichever is necessary) along with the application form while submitting.
  6. Originals might be collected by the authorities for verification purposes.
  7. The collected originals will be returned back to the applicant right after verification.
  8. Applicant can get their permit within 21 days. It can be sent via post or the applicant can get it by visiting the Ministry directly.
  9. If the certificate wasn’t issued within 21 days, then, the applicant can visit the Ministry to know the details of their application.<br




Required Documents

[edit]


Documents that are required for the application process are listed below:

  • Commercial Registration Certificate
  • Business License (previously issued)
  • Passport size photographs (recently taken)





Office Locations & Contacts

[edit]


Location: Addis Ababa
Address:Ethiopian Ministry of Trade and Industry, Adwa St, Addis Ababa, Ethiopia
Contact: +251115518025
Contact link



Eligibility

[edit]

The industry must have a business license and must be an already existing industry in Ethiopia.


Fees

[edit]

Fee must be paid as per the authority’s request.


Validity

[edit]

Valid until the completion of the upgrading or expansion process.


Documents to Use

[edit]

Please attach documents that can be used by people. e.g. links




Sample Documents

[edit]

Please attach sample completed documents that would help other people.



Processing Time

[edit]

The process takes 21 days.


[edit]


Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.gIn the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.




Instructions

[edit]

The permission issued by the Ministry is only valid until the completion of the expanding or upgrading process and it shall not be used for manufacturing or production services.


Required Information

[edit]

  • Full name of Applicant
  • Registered/Residential Address of the Applicant
  • Date of Birth
  • Place of Birth
  • Nationality of the Applicant
  • Occupation/Business
  • Description and Location of Property
  • Condition of Property
  • Name, Address and Nationality of vendor




Need for the Document

[edit]


Any person desiring to produce goods or dispense service by expanding or upgrading an existing industry, or agricultural development or a service business, may apply to the appropriate authority to obtain a permit by attaching the documents specified under Article 32 of the Ethiopian Proclamation.


Information which might help

[edit]


Please provide more information that might help.



Other uses of the Document/Certificate

[edit]

Please provide other uses of the documents.




External Links

[edit]


Others

[edit]

More information which might help




Content is available under Creative Commons Attribution unless otherwise noted.
Privacy policy About Wikiprocedure Disclaimers