Procedure
Apply via Agent
Apply In-Person:
- Application for a new electricity connection in Ethiopia is available in the Ethiopian Electric Power Corporation contact link
- Applicant must enter all necessary information requested in the application form.
- Documents that are needed for completing application procedure are listed under “Required Documents” section of this page.
- Applicant must carry both photocopies and originals of all those documents while applying for this procedure.
- Attach photocopies of documents along with the application form (whichever is necessary).
- Fee for this procedure depends upon the existing power connection and power requirements.
- If all above-mentioned procedures are followed properly, electricity connection will be provided within 3 months.
Required Documents
- ID Proof
- Route Sketch Map
- Copy of title deed
- Land search documents for owner of property
- Supply contract form
- Wiring certificates
- Consent from the property owner
- Scaled site Plan
- Load Schedule Details
Office Locations & Contacts
Location: Addis Ababa
Address: Ethiopian Electric Power Corporation, Addis Ababa, Ethiopia
Contact No:+251111559567
Contact link
Location link
Eligibility
- Newly constructed house or building with no existing electricity connection.
- Existing connections which want to change the connection address, watt type, voltage etc.
Fees
Fee for this procedure depends upon the type of connection and power requirements.
Validity
Documents to Use
Please attach some links of documents that might help.
Sample Documents
Please attach sample completed would help other people.
Processing Time
Processing time for this procedure is 3 months.
Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.gIn the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.
Instructions
- Applicant must provide genuine information while applying for this procedure.
- Applicant must follow all instructions provided by concerned authorities properly.
Required Information
- Type of Application
- Name
- Country of Residence
- Postal Code
- Mobile Number
- Email Address
- Contact Person
Need for the Document
It is necessary for getting an electricity connection in Ethiopia.
If an application is not completed and submitted incomplete, then, the application will be rejected by concerned authorities.
Other uses of the Document/Certificate
Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.
External Links
Ethiopian Electric Power Corporation website link
Others
More information which might help