Procedure
Apply via Agent
Apply In-Person:
- To apply for sewer connection all you need is to fill in an application form which can be obtained from the Water Utilities Corporation (WUC) front office or download it via this link FORM
- Accurately fill in the application form and attach all the requirement and submit them, if you encounter any difficult in filling the form, please ask for assistance from the staff
- Upon payment of deposit fee the WUC will then conduct a Survey of the customer premises to determine the requirements for the new connection within seven days of registering of the application forms
- The customer takes all responsibility for construction and connection costs which will be effected within three days after drainage works are completed and approved.
- During the installation of a new connection, the customer will be provided with information explaining how to maintain the sewer connection and what to do in case of a sewer blockage.
- The customer will receive his or her first bill with sewer charges within one month from the connection date.
Required Documents
- Copy of Omang (citizen) or passport (non-citizen).
- Certificate of Rights for land use. This could be a lease agreement, a title deed or a letter of allocation of land.
- Document of matrimonial status (where applicable) for residential and if the property is in the name of a woman.
- Company registration certificate.
- Completed application form and official stamp.
- Application fees
- Any other document that may be specified by the WUC officer.
Office Locations & Contacts
Water Utilities Corporation (WUC):
Toll Free: 0800 555 555
Land line: 399 25 00
SMS : 16299
E-mail: contactcentre@wuc.bw
website link
Eligibility
Fees
Validity
- Sewage connection will be valid forever, failure to pay the monthly bill will lead to disconnection of the service
Documents to Use
Sample Documents
Please attach sample completed documents that would help other people.
Processing Time
Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.
Instructions
For connection points which are within 30m radius, approval will be given right away. Those connection points more than 30m, customers have to provide technical drawing of the route to the connection point, the pipeline data and the connection details, and also approval for
land use (way leave). For this submission, approval has to be undertaken first before payment is affected.
Required Information
- Customer details
- Physical address of the premise
- Service connection details
- Type of application
- Owner/landlord contract details
- Signature of the owner
Need for the Document
This document gives applicant the guideline on how to apply for sewage connection services with the Water Utilities Corporation (WUC) In Botswana
Enter other informations which might help.
Other uses of the Document/Certificate
- Water and sewage monthly invoice can be used as proof of residence
External Links
Others
More information which might help people.