West Bengal - Request for Disconnection of Electricity Connection


Advertisement

ProcedureEdit

Apply In-Person:

  1. Approach the WBSEDCL office and collect the Application form for disconnection of electricity supply.
  2. Refer to the “Office Locations & Contacts” section in this procedure to see the respective address and contact details.
  3. Consumer has to submit an affidavit on Notary Stamp Paper of Rs. 10, stating the reason of permanent disconnection to the Area Executive Engineer, Distribution Division along with copy of the latest Bill.
  4. Consumer has to deposit the outstanding dues & has to deposit the required PD Fee at the office of Executive Engineer, Distribution Division, as per details mentioned in the Fees section of this procedure.
  5. Fill in the form and submit it at the respective office along with the required documents and collect required acknowledgement.
  6. Please make sure you have all the documents that are listed down the “Required Document” section of this page.
  7. The applicant will be contacted by respective officer /Call Centre Representative on email/mobile provided by you for verification.
  8. Once verification and payment procedure is successful and acknowledgement is submitted, the disconnection will be effected according to consumer’s application.



Advertisement

Required DocumentsEdit

  • Application form
  • Photograph (File size must be less than 500KB.)
  • Copy of last bill.
  • Copy of payment receipt of last bill
  • Proof of ownership (File size must be less than 500KB.)
  • Proof of identity (File size must be less than 500KB.)



Office Locations & ContactsEdit

WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
State Public Information Officer
RE Head Quater, WBSEDCL ,
2nd Floor , D-Block, Vidyut Bhavan ,
Block DJ - Sector - II , Salt Lake , Kolkata-700091Ph.No.033-23585977E-mail: [email protected]
Contact link: Link
Customer Care Centre contact link: Link, Link

EligibilityEdit

Consumers already having an electricity connection can apply for this request.


FeesEdit

Disconnection and Reconnection of supply for any reason whatsoever (Disconnection and Reconnection to be separately treated as single job).

  • Consumer having load above 100BHP/75KW per job: Rs. 1000
  • Power consumers up to 100BHP/75KW per job: Rs. 500
  • All other categories of Consumers per job: Rs. 300


ValidityEdit

The disconnection will be available as long as the mentioned period by the applicant.


Documents to UseEdit

Please attach documents that can be used by people. e.g. links



Sample DocumentsEdit

Please attach sample completed documents that would help other people.


Processing TimeEdit

The notice period shall be 30 days for all consumers. Upon service of the said notice, the licensee shall arrange to take reading, disconnect the supply, remove meter, cable etc., deliver final bill including all arrears up to the date of disconnection within 30 days from the date of said application. Upon payment, the Licensee shall issue receipt with FINAL BILL stamped on it, which shall be treated as No Dues Certificate.]


Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.


InstructionsEdit

  • A consumer may terminate the agreement after giving a notice in the specified format ((Hindi, English)). The notice period shall be 30 days for all consumers. Upon service of the said notice, the licensee shall arrange to take reading, disconnect the supply, remove meter, cable etc., deliver final bill including all arrears up to the date of disconnection within 30 days from the date of said application. Upon payment, the Licensee shall issue receipt with FINAL BILL stamped on it, which shall be treated as No Dues Certificate.]
  • If the dues are not paid by the consumers the surcharge payable by the consumer on dues shall be levied up to the period of issue of section-5 notice, or for maximum eight months only.
  • The security amount shall be adjusted first and after adjusting the security amount the net arrear shall be calculated on which surcharge shall be payable by the consumer.


Required InformationEdit

  • Connection No.
  • Contracted load
  • Date of receipt of application
  • General information
  • Individual name and designation
  • Address
  • Email
  • Mobile no.
  • Aadhar no.
  • Connected load on kW
  • Contract demand (KVA)


Need for the DocumentEdit

Please provide the need for the procedure. e.g. Birth Certificate - why do we need to have a birth certificate?


Information which might helpEdit

Enter other information which might help.


Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.


External LinksEdit

Place some external links which might help.


OthersEdit

More information which might help people.