Qatar - Apply Electricity and Water Supply for Bulk Customers


Advertisement

ProcedureEdit

Apply In-Person:

  1. To apply electricity and water supply for bulk customers, applicant has to visit the Qatar General Electricity and Water Corporation (KAHRAMAA) office.
  2. For Qatar General Electricity and Water Corporation (KAHRAMAA) office contact click here: Contact link
  3. For industries application form can be downloaded from the below link: application form
  4. For non-industries application form can be downloaded from the below link: application form
  5. Now complete the form with necessary information and make sure you have all the documents in hand that are listed under the “Required Documents” section of this page.
  6. After filling the form, attach the documents mentioned in the required documents section below with the completed application form.
  7. Check the application form and then submit it to the respective officer in the KAHRAMAA office. The address is mentioned in the office locations & contacts section below.
  8. Now the authorities will verify your application and validate the submitted documents.
  9. After verification process, electricity and water supply will be provided.


Advertisement

Required DocumentsEdit

  • Copy of Qatar ID card (For residential building).
  • Copy of establishment ID card (For commercial or industrial building).
  • Project location map (hard & electronic digital AutoCAD file copies) and master schedule.
  • Annual maintenance schedule.
  • Proposed Location Map of the Ground Reservoir (hard & electronic digital AutoCAD file copies) and building permit approval.


Office Locations & ContactsEdit

Qatar General Electricity and Water Corporation (KAHRAMAA) - Home Office
Corniche Street, Number 61,Sheraton Roundabout,
Doha, Qatar.
P.O. Box: 41.
Phone: +974-4484-5555;
Fax: +974-4484-5496.
Email Id: [email protected]
Website:Link

EligibilityEdit

  • Commercial or industrial building who have valid establishment ID card are eligible to apply.
  • Residential building who have valid Qatar ID card are eligible to apply.


FeesEdit

Approach authorities for fees details.


ValidityEdit

Explain the time until which the certificate/document is valid.
e.g. Birth Certificate Valid Forever


Documents to UseEdit

Please attach documents that can be used by people. e.g. links


Sample DocumentsEdit

Please attach sample completed documents that would help other people.


Processing TimeEdit

The processing time is between five to ten days. This time may vary depending on the availability and correctness of the information provided.


Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type=’website’>video ID|width|height<&/video&> from external websites.
Please remove the ‘&’ inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url ‘http://www.youtube.com/watch?v=Y0US7oR_t3M’ Video ID is ‘Y0US7oR_t3M’.


InstructionsEdit

  • KAHRAMAA allows business owners dealing with projects that demand an intensive amount of electricity and water to bulk purchase their supplies ahead of time.
  • As per Ministry of Energy and Industry regulations, costumers are not allowed to generate and meet their own electricity and water demand without prior permission from KAHRAMAA.


Required InformationEdit

  • Name of the applicant or Company.
  • Address.
  • Phone number.
  • Email ID.
  • Qatar ID card number.
  • Establishment ID card.


Need for the DocumentEdit

  • To run industries or any firm which requires large amount of electricity and water supply, this license is mandatory.


Information which might helpEdit

  • The Ministry has the authority to abandon the candidate or take any official action against forgery or manipulation of data by the applicant.
  • KAHRAMAA definition of bulk customer: any customer with actual or forecasted maximum demand that equals or exceeds 5 MW of power and/or 25M3/hour (0.132MIGD) of water.


Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.


External LinksEdit

Link


OthersEdit

More information which might help people.