Advertisement

ProcedureEdit

Apply In-Person

  1. To Apply for Building Permit in Ghana, the applicant must go to the Accra Metropolitan Assembly (AMA) office. contact link
  2. Then, the applicant must obtain the application form from the AMA office.
  3. Applicant has to enter all information in the application form.
  4. Applicant must make sure to carry all necessary documents that are mentioned under “Required Documents” section of this page.
  5. Applicant should attach photocopies of documents along with the application form while submitting it at the office.
  6. Building plan approval fee: 1.1% of the estimated cost of construction.
  7. Before applicant can get a permit, the government agency has to confirm that the land legally belongs to you.
  8. After the Land Commission has confirmed that he/she do indeed own the land his/her want to build on, he/she can begin the building permit process with the AMA. The AMA will assemble a committee of inspectors to observe the land and analyze your building plans or House Plans.
  9.  If they approve of his/her plans, they will submit a recommendation to the Statutory Planning Committee, which is the government agency that will actually administer the building permit once the documentation has been reviewed.
  10.  A building permit will be issued. The building permit is granted only provisionally, until the structural segment is approved.
  11. Generally, the processing time for this procedure 10 working days.


Advertisement

Required DocumentsEdit

  • Application form (properly filled-up application forms duly signed and sealed by engineer concerned)
  • Attach completed lad ownership document from lands commission.
  • Attach three/four copies of architectural drawings signed by an engineer.
  • Attach four copies of structural drawings signed by an engineer.
  • The proposed development must conform to zoning status.
  • A certified soil test report.
  • Fire certified report including drawings from the Ghana national fire service.
  • Environmental protection agency permit.
  • Structural integrity report in case construction development has already commenced or is completed.


Office Locations & ContactsEdit

Location: Accra
Address: Accra Metropolitan Assembly
HQ2W+7HM, Accra, Ghana.
Contact number:- +233 30 266 3947
Website link
Digital address: GA-143-7447
P.O. Box GP 385, Accra Central, Accra, Ghana.
Telephone number- +233 (0) 302 665 951
Email id: [email protected]
Contact link
Location link

EligibilityEdit

All companies and other stakeholders who wish to invest in construction work in Ghana.

FeesEdit

Building plan approval fee: 1.1% of the estimated cost of construction.

ValidityEdit

Valid for 1 year then a renewal is required.

Documents to UseEdit

Please attach documents that can be used by people. e.g. links


Sample DocumentsEdit

Please attach sample completed documents that would help other people.


Processing TimeEdit

The Processing time for this procedure is 10 working days.

Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.


InstructionsEdit

Please provide other instructions related to the certificate/documents.
E.g. the state office holds birth records since January 1908.


Required InformationEdit

  • Applicant’s name
  • Applicant’s address
  • Company residential address (proof)
  • Contact number
  • Email id
  • Fax number
  • Postal address
  • Company name
  • Company details
  • Employee details
  • Equipment’s facility to the company
  • Other information


Need for the DocumentEdit

Applicant needs a building permit, not only because it is a requirement but also for it will give you assurance of safety and protection. It will also aid the property value and help his/her save money since building a house without a permit can double fees in the long run.

Information which might helpEdit

  • A building permit is a written authorised document from the metropolitan assembly to carry out development based on the conditions specified within the permit.
  • Each permit issued gives consideration to matters relating to zoning, planning standard and the structural conditions of the proposed building.


Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.


External LinksEdit

Link

OthersEdit

More information which might help people.