Advertisement

ProcedureEdit

Apply In-Person:

  1. To apply for Water and Sewage Connection in Ghana, the applicant has to approach the Ministry of Water Resources and Irrigation. Contact link
  2. Applicant must obtain the application form from respective office.
  3. Applicant then is required to purchase application form at a rate that may be determined by the GWCL branch office within the district where the service is required.
  4. Read carefully through the application form as it contains different section, if you encounter any difficult, please ask for assistance from the supporting staff.
  5. Pick the control ticket service number and wait for your ticket number to be called.
  6. Submit the completed form along with the supporting documents to the attending staff for verification and processing.
  7. After logging your application, inspectors from the SIS, will visit the applicant’s (your)premises within 5 working days to survey and determine the feasibility or otherwise of a connection, after which the applicant will be advised on the finding report.
  8. Where the connection is not feasible, the Company's Connection Team shall state the reasons thereof to the applicant.
  9. Where the connection is feasible, the Company's Connection Team shall determine the nearest point of connection to the service mains and provide the applicant with an estimate of the cost of connection.
  10. Depending on the quoted costs, you will be required to proceed and make payments at the GWCL office, where you will be issued with a receipt.
  11. A fee for this procedure is has to be paid as per as authority request.
  12. Upon payment of the required cost, External works, meter installation, and other essential processes will be done to make sure you can access water in 10 working days.



Advertisement

Required DocumentsEdit

  • Application form
  • An approved permit
  • Name and address of applicant
  • Telephone number/ e mail number
  • The number or address of house /premises to be connected
  • Purpose of which the supply is required (whether for domestic, construction, commercial or industrial use)
  • Identification document (valid passport)
  • National identification card



Office Locations & ContactsEdit

Ministry of Water Resources and Irrigation
Address: 1 Nile Corniche, الوراق، Giza District,
Giza Governorate, Egypt
36RG+GH Giza District, Egypt
Contact number- +20235449417/ 22617304 - 22617308 - 22617358 - 22617344 – 22617345
E-mail: [email protected]
Contact link
Location link

EligibilityEdit

  • All Egyptian citizens and companies/organizations are eligible.



FeesEdit

  • A fee for this procedure is has to be paid as per as authority request.



ValidityEdit

  • The water connection is valid forever unless failure of payment of the water bill, thus lead to disconnection of the service.



Documents to UseEdit

Please attach documents that can be used by people. e.g. links



Sample DocumentsEdit

Please attach sample completed documents that would help other people.



Processing TimeEdit

  • The processing time for this procedure is taken 15 working days.



Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.



InstructionsEdit

Please provide other instructions related to the certificate/documents.
E.g. the state office holds birth records since January 1908.


Required InformationEdit

  • Name of the applicant
  • Type of connection( domestic/industrial/commercial)
  • Contact detail of the applicant/company
  • Location address of the residence that need connection
  • Id card/passport number
  • National identification card



Need for the DocumentEdit

  • Industrial sewage is used water from manufacturing or chemical processes. Storm sewage, or storm water, is runoff from precipitation that is collected in a system of pipes or open channels.



Information which might helpEdit

  • The Ministry of Water Resources and Irrigation is the ministry in charge of managing the water resources of the Arab Republic of Egypt mainly the Nile. It also manages irrigation projects in Egypt, such as the Aswan Dam and Al-Salam Canal. Its headquarters are in Cairo.



Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.



External LinksEdit

Contact link


OthersEdit

More information which might help people.