Cameroon - Obtain Building Demolition Permit
Advertisement
ProcedureEdit
- To obtain a Building Demolition permit, you have to get in touch with the town hall of your local municipal office of the area where the land is located.
- Make sure you have all the documents that are listed under the Required Documents section of this page.
- Submit the completed application form along with the documents in the Mayor's office.
- Within 15 days after submitting the application the mayor will verify the application and documents supplied, after which the Name of the Requester, Address, Surface excluding Network and Destination of the Construction will be displayed in the town/city hall of notice.
- After, validating the application and discussion of the application with the review board building members th final decision will be notified by the Mayor to the applicant.
The application must also specify the following listed:
- Actual conditions of use and occupancy of the building
- The surface of floors excluding net work
- The reasons for the proposed transaction
- The nature and extent of work required on partial demolition
- The technical measures of stability and security of the parties to maintain
- Neighborhood safety engineering measures
Advertisement
Required DocumentsEdit
- An application form stamped and obtained from the city/town hall of the municipal office and completed by the applicant.
- The site plan.
- The ground plane of the buildings to demolish or preserve.
Office Locations & ContactsEdit
You have to approach the town hall of your local municipal office of your area.
EligibilityEdit
Provide eligibility criteria's for going through this procedure.
FeesEdit
Explain the fees structure which is required for obtaining the certificate/document.
ValidityEdit
The demolition permit will be invalid after one year from the date of issue.
Documents to UseEdit
Please attach documents that can be used by people. e.g. links
Sample DocumentsEdit
Please attach sample completed documents that would help other people.
Processing TimeEdit
Please explain processing time taken in obtaining the document/certificate.
Related VideosEdit
Videos explaining the procedure or to fill the applications. Attach videos using the following tag <&video type="website">video ID|width|height<&/video&> from external websites. Please remove the "&" inside the tags during implementation. Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver, sevenload, viddler, vimeo, youku, youtube width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed. e.g In the following url "http://www.youtube.com/watch?v=Y0US7oR_t3M" Video ID is "Y0US7oR_t3M".
InstructionsEdit
Please provide instructions on obtaining the certificate/documents. e.g. The state office holds birth records since January 1908.
Required InformationEdit
A list which displays the kind of information which is required to complete the procedure. e.g. 1. Date of Birth. 2. City or County of Birth.
Need for the DocumentEdit
Please provide the need for the procedure. e.g. Birth Certificate - why do we need to have a birth certificate?
Information which might helpEdit
Enter other information which might help
Other uses of the Document/CertificateEdit
Please explain what are other uses of obtaining this document/certificate. e.g. Birth Certificate can be used as proof of identity.
External LinksEdit
Place some external links which might help
OthersEdit
More information which might help people.