Madhya Pradesh - Permission to Erect a New Lift or Elevator


Advertisement

ProcedureEdit

Apply In-Person:

  1. The owner of a place intending to erect or install a Lift or Escalator shall apply with their respective Divisional Electrical Inspector (DEI).
  2. Link for contact information: link Please use the contact information as per your area / region.
  3. Go to the office, meet the designated authority. Consult with the authority for your requirement. Ensure that the lift erection company is approved one with the authority. Obtain the application form or write on an A4 sheet as advised.
  4. Fill the form with appropriate information.
  5. Submit the completed application form and original treasury challan along with required documents as mentioned in the required documents section below to the designated receiving authority.
  6. After receipt of application, the receiving authority will check the submitted application and documents. If all are in place, an acknowledgement will be issued for acceptance of application. This application will be processed further.
  7. Applicant gets SMS notification on their registered mobile number about the different stages of process.
  8. An Inspector/technician will visit the premises as per the address mentioned in the application.
  9. He will do the due diligence for the approval to erect the lift or elevator.
  10. The result of the inspection will be recorded and the report will be forwarded to the issuing department.
  11. Once all the above steps are satisfactory, approval will be granted.
  12. Applicant shall follow the department notification and follow authorities guidelines to get the sanction letter as per deliverable (hand delivered or through post) norms.


Note:
  • It is advised to submit additional set of copy of the application and documents to get counter signed for your safety while applying with government department.
  • Visit your friend or known place where such lift or elevator is installed recently to get useful information.


Advertisement

Required DocumentsEdit

  • Completed application “Form A” in consultation with the lift company.
  • In case of a company, memorandum of Association and Articles of association.
  • In case of a partnership firm partnership deed along with tax paid details.
  • Authorization letter to the authorized signatory - In case of a partnership firm all the partners of the firm and in case of a registered company not less than two third of total number of Directors may resolve and issue an authorization letter to the authorized signatory to sign the application, completion report, etc.
  • Copy of latest tax (land/khata) paid receipt
  • Triplicate copies of drawings duly signed by the applicant and licenced electrical contractor, showing wiring scheme for the complete lift installation including earthing scheme
  • Copy of approval obtained from the Urban Local Body concerned for the Building Plan
  • Notarized declaration from the person authorized for erection of Lift or Escalator
  • Original treasury challan
  • Aadhaar card
  • Enclose triplicate copies of drawings duly signed by the applicant and authorized person of Lift Company, showing
    • Layout of the lift erection
    • Plan
    • Section Elevation
    • Arrangement of Doors
    • Lift well Enclosure
    • Size and position of the machine relating to the lift well
    • Position of hoisting machine
    • Number of floors to be served and total travel


Note : In addition to the above mentioned documents, applicant should produce any additional document as per authority’s advice


Office Locations & ContactsEdit

Chief Engineer(ES) & Chief Electrical Inspector
A-Wing, 3rd Floor, Satpura Bhawan, Bhopal.
Telephone Number - 0755-2551612
Fax- 0755-2552383
E-mail- [email protected]
Contacts link: link

EligibilityEdit

  • New building while construction with proper approval shall apply for this permission.
  • Active consumers whose premises require lift or elevator erection shall apply.


FeesEdit

  • Please pay as per the arrived charges based on the requirements.
  • Fees shall be paid by way of challan under the appropriate head of account prescribed from time to time and the original challan shall be forwarded to the Chief Inspector/designated authority.


ValidityEdit

  • Valid for six months to One Year from the date on which it is granted.
  • The Permission can be extended further to a period of six months on receipt of application stating the reason along with fees through original challan for the advised amount.


Documents to UseEdit

Please attach documents that can be used by people. e.g. links


Sample DocumentsEdit

Please attach sample completed documents that would help other people.


Processing TimeEdit

  • Grant of permission can be obtained within one month from the date of receipt of the application.


Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.


InstructionsEdit

Please provide other instructions related to the certificate/documents.
e.g. The state office holds birth records since january 1908.


Required InformationEdit

  • Applicant name
  • Applicant address
  • Mobile number
  • Consumer Number for electrical supply
  • Drawing drawn to a scale of not less than 1:100 of the installation duly signed by the applicant and the registered person. Drawing of shall include following particulars, namely:-.


(A) In case of a lift:-
  1. Location of the Lift with respect to the building
  2. General Layout of each Lift Installation
  3. Plan and sectional elevation of lift shaft, Lift machine room and lift car
  4. Arrangement of doors
  5. Number of floors to be served and total travel
  6. Lift well enclosure
  7. Size and position of the equipment’s relating to the lift well
  8. Position of hoisting machines
  9. Wiring diagram of lift well enclosure, machine room, control panel, and lift equipment with all wiring, light points and switches
  10. Earthing scheme with size of earth leads, method of construction of earth electrodes, location of earth pits


(B) in case of an escalator or passenger conveyor:-
  1. Location of the Escalator or Passenger conveyor
  2. General layout of Escalator or Passenger conveyor Installation
  3. Plan and Sectional elevation of Escalator or Passenger conveyor
  4. Angle of inclination of Escalator or Passenger conveyor with the horizontal
  5. Width of Escalator or Passenger conveyor
  6. Vertical rise of the Escalator or Passenger conveyor
  7. Arrangement of track and trusses or girders
  8. Size and Position of machine room with respect to the Escalator or Passenger conveyor
  9. Details of complete step treads and complete assemblies
  10. Wiring diagram of machine room, control panel, and the Escalator or Passenger conveyor equipment
  11. Position or location of main switches or power supply panel and
  12. Earthing scheme with size of earth leads, method of construction of earth electrodes, location of earth pits.


Note:Apart from the above list of information, respective state department authorities will provide updated information which need to be followed for completion of this procedure.


Need for the DocumentEdit

  • Electrical Lift Installations in commercial, residential, office complexes, etc., (excluding the lift covered under the Factories Act, 1948) are inspected and licenses are issued / renewed to secure protection to the persons using the lifts and safe working of lifts.
  • So it is mandatory to get the permission for such installations.


Information which might helpEdit

  • The erection of the lift shall be carried out strictly according to the sanctioned drawings as well as per the provisions of Lifts Act and Rules.
  • Make sure to collect the receipt for your payments with the department.
  • Always use certified products for electrical wiring.
  • One should not use domestic supply for commercial purpose and there will be a heavy fine and even action against consumer is inevitable.


Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.


External LinksEdit

Place some external links which might help.


OthersEdit

More information which might help people.