Kerala - Permission to Erect a New Lift or Elevator
Advertisement
ProcedureEdit
Apply In-Person:
- The owner of a place intending to erect or install a Lift or Escalator shall apply with their respective Divisional Electrical Inspector (DEI).
- Link for contact information:link Please use your area/region contact details as applicable.
- Go to the office, meet the designated authority. Consult with the authority for your requirement. Ensure that the lift erection company is approved one with the authority. Obtain the application form or write on an A4 sheet as advised.
- Use the following link to download application online: form link
- Download the form. Fill the form with appropriate information.
- Submit the completed application form and original treasury challan along with required documents as mentioned in the required documents section below to the designated receiving authority.
- After receipt of application, the receiving authority will check the submitted application and documents. If all are in place, an acknowledgement will be issued for acceptance of application. This application will be processed further.
- Applicant gets SMS notification on their registered mobile number about the different stages of process.
- An Inspector/technician will visit the premises as per the address mentioned in the application.
- He will do the due diligence for the approval to erect the lift or elevator.
- The result of the inspection will be recorded and the report will be forwarded to the issuing department.
- Once all the above steps are satisfactory, approval will be granted.
- Applicant shall follow the department notification and follow authorities guidelines to get the sanction letter as per deliverable (hand delivered or through post) norms.
- Note:
- It is advised to submit additional set of copy of the application and documents to get counter signed for your safety while applying with government department.
- Visit your friend or known place where such lift or elevator is installed recently to get useful information.
Apply through Centres:
- To apply through centres, the applicant has to visit the respective “CSC” centre. Please tap on the following link to locate the centre according to the respective district: link.
- Make sure to have the documents that are listed under the “Required Documents” section of this page.
- It is advised to take the documents in original to the kiosk for scanning purposes.
- The operator will process the application online.
- On successful submission, the applicant will receive an application number as acknowledgement.
- The status, viz. Approval or Rejection if any, will be conveyed to the applicant through an SMS.
- If verified, the permit will be hand delivered or sent through post to the address mentioned while applying in a stipulated period of time.
Advertisement
Required DocumentsEdit
- Please follow the link for details:link
- Completed application “Form A” in consultation with the lift company.
- In case of a company, memorandum of Association and Articles of association.
- In case of a partnership firm partnership deed along with tax paid details.
- Authorization letter to the authorized signatory - In case of a partnership firm all the partners of the firm and in case of a registered company not less than two third of total number of Directors may resolve and issue an authorization letter to the authorized signatory to sign the application, completion report, etc.
- Copy of latest tax (land/khata) paid receipt
- Triplicate copies of drawings duly signed by the applicant and licenced electrical contractor, showing wiring scheme for the complete lift installation including earthing scheme
- Copy of approval obtained from the Urban Local Body concerned for the Building Plan
- Notarized declaration from the person authorized for erection of Lift or Escalator
- Original treasury challan
- Aadhaar card
- Enclose triplicate copies of drawings duly signed by the applicant and authorized person of Lift Company, showing
- Layout of the lift erection
- Plan
- Section Elevation
- Arrangement of Doors
- Lift well Enclosure
- Size and position of the machine relating to the lift well
- Position of hoisting machine
- Number of floors to be served and total travel
- Note : In addition to the above mentioned documents, applicant should produce any additional document as per authority’s advice
Office Locations & ContactsEdit
Chief Electrical Inspector to Government.
Housing Board Building, Shanti Nagar
Thiruvananthapuram
Kerala.
Phone: +91 0471-2330558 (CEI)
Email: [email protected] , [email protected]
Contacts link: link<be>
EligibilityEdit
- New building while construction with proper approval shall apply for this permission.
- Active consumers whose premises require lift or elevator erection shall apply.
FeesEdit
- Please pay as per the arrived charges based on the requirements.
- An original chalan of Rs. 2100/- (Rupees Two Thousand and One Hundred only) towards application fee for each lift / escalator installation remitted into Government Treasury under Head of Account 0043-00-102-99 (through Treasury Manual chalan/ eChalan/ JSK).
- Fees shall be paid by way of challan under the appropriate head of account prescribed from time to time and the original challan shall be forwarded to the Chief Inspector/designated authority.
ValidityEdit
- Valid for six months to One Year from the date on which it is granted.
- The Permission can be extended further to a period of six months on receipt of application stating the reason along with fees through original challan for the advised amount.
Documents to UseEdit
Use the following link to download application online: form link
Sample DocumentsEdit
Please attach sample completed documents that would help other people.
Processing TimeEdit
- Grant of permission can be obtained within one month from the date of receipt of the application.
Related VideosEdit
Videos explaining the procedure or to fill the applications. Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites. Please remove the '&' inside the tags during implementation. Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver, sevenload, viddler, vimeo, youku, youtube width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed. e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.
InstructionsEdit
Please provide other instructions related to the certificate/documents. e.g. The state office holds birth records since january 1908.
Required InformationEdit
- Applicant name
- Applicant address
- Mobile number
- Consumer Number for electrical supply
- Drawing drawn to a scale of not less than 1:100 of the installation duly signed by the applicant and the registered person. Drawing of shall include following particulars, namely:-.
- (A) In case of a lift:-
- Location of the Lift with respect to the building
- General Layout of each Lift Installation
- Plan and sectional elevation of lift shaft, Lift machine room and lift car
- Arrangement of doors
- Number of floors to be served and total travel
- Lift well enclosure
- Size and position of the equipment’s relating to the lift well
- Position of hoisting machines
- Wiring diagram of lift well enclosure, machine room, control panel, and lift equipment with all wiring, light points and switches
- Earthing scheme with size of earth leads, method of construction of earth electrodes, location of earth pits
- (B) in case of an escalator or passenger conveyor:-
- Location of the Escalator or Passenger conveyor
- General layout of Escalator or Passenger conveyor Installation
- Plan and Sectional elevation of Escalator or Passenger conveyor
- Angle of inclination of Escalator or Passenger conveyor with the horizontal
- Width of Escalator or Passenger conveyor
- Vertical rise of the Escalator or Passenger conveyor
- Arrangement of track and trusses or girders
- Size and Position of machine room with respect to the Escalator or Passenger conveyor
- Details of complete step treads and complete assemblies
- Wiring diagram of machine room, control panel, and the Escalator or Passenger conveyor equipment
- Position or location of main switches or power supply panel and
- Earthing scheme with size of earth leads, method of construction of earth electrodes, location of earth pits.
- Note: Apart from the above list of information, respective state department authorities will provide updated information which need to be followed for completion of this procedure.
Need for the DocumentEdit
- Electrical Lift Installations in commercial, residential, office complexes, etc., (excluding the lift covered under the Factories Act, 1948) are inspected and licenses are issued / renewed to secure protection to the persons using the lifts and safe working of lifts.
- So it is mandatory to get the permission for such installations.
Information which might helpEdit
- The erection of the lift shall be carried out strictly according to the sanctioned drawings as well as per the provisions of Lifts Act and Rules.
- Make sure to collect the receipt for your payments with the department.
- Always use certified products for electrical wiring.
- One should not use domestic supply for commercial purpose and there will be a heavy fine and even action against consumer is inevitable.
Other uses of the Document/CertificateEdit
Please explain what are other uses of obtaining this document/certificate. e.g. Birth Certificate can be used as proof of identity.
External LinksEdit
Place some external links which might help.
OthersEdit
More information which might help people.