Advertisement

ProcedureEdit

To obtain electricity connection for their premises, one has to apply at the respective electricity board/company office of their respective area.

  • Gujarat UrjaVikas Nigam Ltd. (GUVNL) is the electricity Holding and regulation board operating within the state of Gujarat.
  • In Gujarat, Electricity distribution is carried out by.
  • UGVCL (Uttar Gujarat Vij Company Ltd)
  • DGVCL (Dakshin Gujarat Vij Company Ltd)
  • MGVCL (Madhya Gujarat Vij Company Ltd)
  • PGVCL (Paschim Gujarat Vij Company Ltd.)

Apply In-Person:

  1. Go to your area local Electricity office personally and consult with the authority for your need. They will suggest you with the correct main/division office to contact and apply for Electricity (EB) connection.
  2. Please use the following link and use the appropriate details to get address information of your respective SDM office contact number :
    • Link for UGVCL: Online contact link and link2 here, please hit the respective circles tab as provided on the left part of the page to reach contact details.
    • Link for DGVCL: Online contact link. Applicant shall use the following link link2 in this page hit the respective office tab as provided to get contact information.
    • Link for MGVCL: Online contact link Applicant shall use the following link for contact details of SDM: link1 and link2 hit contact us for details.
    • Link for PGVCL: Online contact link and “janseva Kendra” as per the address provided in the link link. Applicant shall reach sub division offices to apply for connection. link for SDM please use the “About us” menu and hit “office contacts” sub menu to select respective area for contact address.
  3. Go to the respective office (Sub Division) and meet the respective authority with the available documents. On their advice, collect the form and initiate the process to apply.
  4. Applicant shall obtain the form from the respective office (please pay for the form if required) Or can download the form from the following link:
  5. Once the application is filled, then submit it along with required document to the concerned authorities at the respective office. (must include licensed electrical contractor intended to do wiring)
  6. Authorities will verify the submitted documents, if all the documents are in place then authorities will advise the customer to pay the fee for this procedure.
  7. Once the payment is made, a receipt will be issued to the applicant. Keep it safe for future reference.
  8. This application will be subjected for internal processing and a technician will inspect the premises on a scheduled date at the presence of applicant.
  9. At the end of the survey, technician will mark the place for meter to be fixed and also entry of supply mains and other equipment to be fixed. He will also fill the survey report.
  10. If the report shows feasible condition to provide supply, then applicant gets intimation about the sanction.
    • In case applicant fails to comply within a respective period as per norms from the date of power sanction, the power sanction as well as registration shall stand cancelled.
    • If the report shows non feasibility, applicant will be asked to bear the extra cost for providing viable condition as advised by department.
  11. Now approach the office to get the charges for service line, initial security deposit, cost of metre/metering equipment etc.,. Make appropriate payment and obtain the receipt along with application number.
  12. Once all the above said procedures are over and complete, the electricity department/company will issue the work order.
  13. Thereupon the concerned Junior Engineer/Assistant Engineer will arrange to provide the power supply.
  14. Pole will be installed, Applicant has to submit the Test report with the help of licensed electrical contractor followed by provision of Electrical connection.

Note:

  • High Tension (HT) and Low Tension (LT) are two different supply categories

Apply Online:

PGVCL : - Gujarat How to obtain electricity connection Online with Images
  1. To apply online, please follow the below steps..
  2. Go to the online portal portal link and Hit “Consumer Services online” menu and hit ”LT connection” option next to Apply for new connection session to reach the below given Home page for applying online.
  3. Applicant will be directed to the respective portal Home page as per following link.
  4. Please login using the credential by hitting “Login”.
    • If you are not a registered user, then use “Register now” option provide under login session to register and then login.
  5. Here applicant has to enter prompted details for online application form. Upload required documents as prompted and pay the registration charges.
  6. Once all the steps are over, user has to submit the online application by hitting appropriate tab.
  7. Please save the acknowledgement receipt for the submitted application. Keep it safe for future reference.
  8. This submitted application will be processed further. Notification from department (through SMS or over phone) for further process will reach applicant.
  9. Applicant shall go to the respective office with the printout of application along with other documents and follow the guidelines to get the connection.

MGVCL : - Gujarat How to obtain electricity connection Online with Images
  1. To apply online, please follow the below steps..
  2. Go to the online portal portal link and Hit “Consumer Services online” menu and hit ”LT connection” option next to Apply for new connection session to reach the below given Home page for applying online.
  3. Applicant will be directed to the respective portal Home page as per following link.
  4. Please login using the credential by hitting “Login”.
    • If you are not a registered user, then use “Register now” option provide under login session to register and then login.
  5. Here applicant has to enter prompted details for online application form. Upload required documents as prompted and pay the registration charges.
  6. Once all the steps are over, user has to submit the online application by hitting appropriate tab.
  7. Please save the acknowledgement receipt for the submitted application. Keep it safe for future reference.
  8. This submitted application will be processed further. Notification from department (through SMS or over phone) for further process will reach applicant.
  9. Applicant shall go to the respective office with the printout of application along with other documents and follow the guidelines to get the connection.

DGVCL. :
  1. To apply online, please follow the below steps..
  2. Go to the online portal portal link dgvl link and Hit “Consumer Services online” menu and hit ”LT connection” option next to Apply for new connection session to reach the below given Home page for applying online.
  3. Applicant will be directed to the respective portal Home page as per following link.
  4. Please login using the credential by hitting “Login”.
    • If you are not a registered user, then use “Register now” option provide under login session to register and then login.
  5. Here applicant has to enter prompted details for online application form. Upload required documents as prompted and pay the registration charges.
  6. Once all the steps are over, user has to submit the online application by hitting appropriate tab.
  7. Please save the acknowledgement receipt for the submitted application. Keep it safe for future reference.
  8. This submitted application will be processed further. Notification from department (through SMS or over phone) for further process will reach applicant.
  9. Applicant shall go to the respective office with the printout of application along with other documents and follow the guidelines to get the connection.
Advertisement

Required DocumentsEdit

  • Application form.
  • Proof of ownership (Sale deed, katha, succession certificate, sanctioned plan from local authority.)
  • Indemnity Bond as per format supplied by the electricity company, if you are not the owner of the premises
  • No objection certificate (NOC) from the owner(If the applicant is tenant or lessee)
  • Proof of permanent residential address (Ration card, PAN, telephone Bill, Insurance policy bond, voters identity card etc.)
  • Clearances for establishment from the Pollution Control Board concerned where applicable .( residential / residential-cum-commercial premises of more than 100 flats)
  • Self- certification for electrical installation of the premises of the consumer for which new connection is being applied for or the test results duly signed by the licensed Electrical Contractor
  • Requisite Earnest Money as advised
  • Proof of occupation or ownership of a premises through any one of the documents (Passport / Voter Identity Card / Rent Bill / Telephone Bill / Municipal or any other Tax Bill / Ration Card / Certificate from Panchayat)
  • The detailed list of electrical equipment’s with number and corresponding wattages
  • For LV & MV consumers, a sketch of new line required for service connection showing the premises from existing LV & MV line is required to be submitted by the intending consumer. (licensed electrical contractor will be helpful)
  • NOC from local administration (assessment and collection department - no due & litigation free)
  • NOC from respective department for digging (if applicable)
  • Test Certificate of metering equipment, if consumer supplies the same.
  • Land Paper
  • Aadhar Card
  • Photograph of the applicant
  • Contact number
  • Consents / Authorizations / Approvals wherever applicable.
  • Service Connection Agreement, if applicable.
  • Consent of the owner of the property if the proposed service line has to pass through the property of some other persons

Note

  • All original and copy of original with self attestation as advised by respective authorities to submit as per requirement.
  • Apart from the above documents authorities may ask to submit additional information or documents. Please provide them for processing.

Office Locations & ContactsEdit

UTTAR GUJARAT VIJ COMPANY LTD - (UGVCL),
Visnagar Road, Mehsana -384001
Gujarat, India
Phone: +91 (02762) 222080-81
Fax: +91 (02762) 223574
Email : [email protected]
Contacts link : contact information link

DAKSHIN GUJARAT VIJ COMPANY LTD - DGVCL
" UrjaSadan ", Nana Varachha Road,
Kapodara, SURAT-395 006.
Gujarat, India
Phone: (0261) 2506000/2506200/2506112
Fax : (0261) 2572636/2574251
Email : [email protected]
Contacts link : contact information link

MADHYA GUJARAT VIJ COMPANY LTD - MGVCL
Sardar Patel VidyutBhavan,
Race Course, Vadodara-390 007,
Gujarat, India
Phone: (0265) 2310583-86,
Fax : 0265-2337918,2338164
Email : [email protected]
Contacts link : contact information link

PASCHIM GUJARAT VIJ COMPANY LTD. - PGVCL
"Paschim Gujarat VijSevaSadan", Off. Nana Mava Main Road, Laxminagar,
Rajkot - 360004,
Gujarat, India
Phone : 0281-2380425 / 2380427
Fax  : 0281-2380428
E-mail  : [email protected]
Contacts link : contact information link



EligibilityEdit

  • The owner of the proposed property for which the supply is required
  • If the applicant is not the owner of the premises for which supply is required, then he or she should produce a consent letter from the owner of the premise
  • If the owner is not available or not intended to give consent letter, then the applicant should provide…
    • proof of his/her being in lawful occupation of the premises
    • execute an indemnity bond in the respective Form
    • acceptance to pay security deposit twice the normal rate.

FeesEdit

  • Charge differs with requirement. So, authorities estimate will give actual figure for getting connection

ValidityEdit

  • Electricity connection will exists till the premises exists.

Documents to UseEdit

Please attach documents that can be used by people. e.g. links

Sample DocumentsEdit

Please attach sample completed documents that would help other people.

Processing TimeEdit

Processing time varies from 30 / 60/ 90 / 150 / 180 / 270 days depending on the situation.

Related VideosEdit

Videos explaining the procedure or to fill the applications. 
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&> from external websites. 	
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver, 
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.

InstructionsEdit

  • The lawful owner / occupier of premises can apply for the new electricity connection.
  • The applicant should apply in the respective form at the respective office
  • After load survey, he/she will be given quotation for payment of charges which includes Service connection charges , Service Line Charges, Security deposit etc.
  • After payment of above charges the consumer will submit a Test report from the Licensed electrical contractor for the wiring.
  • The service connection will be released as per the chronological order.

Required InformationEdit

  • Full name of the Applicant
  • Gender
  • Age
  • Date of Birth
  • Father's Name or Husband Name
  • Mother's Maiden Name
  • Permanent Address / Temporary Address

Need for the DocumentEdit

  • Our everyday life requires electricity more than anything else. Life without electricity is never possible.
  • The need for Electricity connection starts from construction of house or factory.
  • Connection may be required for a vacant land for water and to give lighting for the fence.
  • Even during construction we require Electricity for many reasons including Water, operation of certain machinery and even to secure the valuables.
  • Government provides electricity connection to those who apply for a new connection.
  • Electricity should be consumed with responsibility. Because not only the cost counts but also this resource needs proper care to make available for our future generations

Information which might helpEdit

  • Always use certified products for electrical wiring.
  • One should not use domestic supply for commercial purpose and there will be a heavy fine and even action against consumer is inevitable.

NOTE : This non - renewable source of energy should be used with care.

Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.

External LinksEdit

Place some external links which might help.

OthersEdit

More information which might help people.