Andaman and Nicobar - Apply for Temporary Electricity Supply

Revision as of 12:20, 27 April 2025 by Wesley (talk | contribs) (Auto)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Advertisement

ProcedureEdit

Apply In-Person:

  1. Approach the ELECTRICITY DEPARTMENT - ANDAMAN & NICOBAR ADMINISTRATION, and collect the Application form.
  2. Refer to the “Office Locations & Contacts” section in this procedure to see the respective address and contact details Contact Link
  3. You can also download an appropriate form from this link.
  4. Fill in the form and submit it at the respective office along with the required documents.
  5. Please make sure you have all the documents that are listed down the “Required Document” section of this page.
  6. The applicant will be contacted by respective officer /Call Centre Representative on email/mobile provided by you for verification.
  7. Once verification and payment procedures are successful, connection will be effected according to consumer’s application.



Apply Online:

  1. To apply for Temporary Electricity Supply in Andaman & Nicobar Islands, the applicant has to follow the provided Link.
  2. In the online services section on the webpage, click on the "Apply For Fresh(New) Meter" and proceed.
  3. A new page will open up for Online Application for Electric Connection (EC).
  4. The applicant has to fill in all the necessary details in the application form.
  5. Select "Type of connection", and click on "Temporary Connection Domestic" or "Temporary Connection Commercial" as required in the field under "Category of Connection".
  6. After providing all the necessary details as instructed, click on the declaration box and then on the "Proceed" option to process further.
  7. Now, upload scanned copy of supporting documents as displayed on the screen such as Record of Right/Form F (if own building/Legal Heir/Joint Property), Rent/Lease Agreement (in case of rented/ leased accommodation), NOC from the owner (in case of rented/leased accommodation), Affidavit for Obtaining Electric Connection (in case of Encroached Land), Tribal Council Certificate (in case of Tribal Area), Quarter Allotment Order (in case of Govt. Quarter) along with a copy of Aadhar Card/Photo Id Address Proof.
  8. Click on the "Submit" button on the webpage and complete the process.
  9. On successful completion, a Unique Application Number will be generated which shall be downloaded and kept for future reference.
  10. The applicant may use the Unique Application Number to track the application status online.
  11. The Department will verify the application & approve it online based on which sanction order will be generated by the portal.



Advertisement

Required DocumentsEdit

  • Application form
  • Photograph (File size must be less than 500KB.)
  • Address Proof *(.pdf) (Any one: Passport, Voter ID, Ration card, Aadhar Card, Permanent Driving License)
  • Identity Proof *(.pdf) (Any one: Aadhar card, PAN card, Voter ID, Driving License, Passport)



Office Locations & ContactsEdit

ELECTRICITY DEPARTMENT - ANDAMAN & NICOBAR ADMINISTRATION,
Port Blair - 744101, 
Andaman & Nicobar, India.
Phone No.  : +91 03192 - 232404, 232685 
FAX NO: 03192 – 233365
e-Mail - [email protected]
Contact Link

EligibilityEdit

Any person or entity can apply

FeesEdit

Charge differs with requirement. So, authorities will estimate and will give actual figure for getting connection


ValidityEdit

The temporary connection will be available as long as the mentioned period by the applicant.


Documents to UseEdit

Please attach documents that can be used by people. e.g. links



Sample DocumentsEdit

Please attach sample completed documents that would help other people.



Processing TimeEdit

The date of availing the temporary supply can got amended by the consumer, by applying to the authority who has issued the orders before the commencement date indicated in the order. However, any alternate date proposed shall commence within 15 days of the date of the first order.


Related VideosEdit

Videos explaining the procedure or to fill the applications.
Attach videos using the following tag <&video type='website'>video ID|width|height<&/video&>
from external websites.
Please remove the '&' inside the tags during implementation.
Website = allocine, blip, dailymotion, facebook, gametrailers, googlevideo, html5, metacafe, myspace, revver,
sevenload, viddler, vimeo, youku, youtube
width = 560, height = 340, Video ID = Can be obtained from the URL of webpage where the video is displayed.
e.g In the following url 'http://www.youtube.com/watch?v=Y0US7oR_t3M' Video ID is 'Y0US7oR_t3M'.



InstructionsEdit

Please provide other instructions related to the certificate/documents.
e.g. The state office holds birth records since january 1908.



Required InformationEdit

  • General information
  • Circle
  • Division
  • sub division
  • category
  • date
  • application for
  • type of supply- Temporary
  • Applicant type
  • Individual name and designation
  • Father/husband name
  • Identity proof
  • Address
  • Email
  • Mobile no.
  • Aadhar no.
  • Connected load on kW
  • Contract demand (KVA)
  • Purpose of supply
  • Supply metering equipment



Need for the DocumentEdit

A temporary electricity supply can help the applicant for both electricity and/or water providing utilities for construction or building work.


Information which might helpEdit

Enter other information which might help.


Other uses of the Document/CertificateEdit

Please explain what are other uses of obtaining this document/certificate.
e.g. Birth Certificate can be used as proof of identity.



External LinksEdit

Place some external links which might help.



OthersEdit

More information which might help people.